feedathon-daily-june-21-2018
This is an old revision of the document!
June 21, 2018
Accomplishments
- Sytem configuration refined and working as diagramed. See the NSG Configuration diagram below.
- 16 feed pols hooked up to the RF switched. Verified the switch is working.
- 200MHz filter from all the RFCB outputs removed. Now have 600MHz coming out out the RFCB
- The HP E4407B and the Aligent EXA N9010Z spectrum analyzers both can be controlled remotely and data gathered.
- Two SNAPS hooked up and working. Running through system tests now.
- Figured out where to measure and debug the Feeds and signal chain. See the Signal Measurements Diagram below.
- A test run of the SNAP all night, all feeds hooked up to the RF switch 1GHz to 10BHz, source: 3c295.
feedathon-daily-june-21-2018.1529681932.txt.gz · Last modified: 2023/10/28 18:36 (external edit)