June 21, 2018

Accomplishments

  1. Sytem configuration refined and working as diagramed. See the NSG Configuration diagram below.
  2. 16 feed pols hooked up to the RF switched. Verified the switch is working.
  3. 200MHz filter from all the RFCB outputs removed. Now have 600MHz coming out out the RFCB
  4. The HP E4407B and the Aligent EXA N9010Z spectrum analyzers both can be controlled remotely and data gathered.
  5. Two SNAPS hooked up and working. Running through system tests now.
  6. Figured out where to measure and debug the Feeds and signal chain. See the Signal Measurements Diagram below.
  7. A test run of the SNAP all night, all feeds hooked up to the RF switch 1GHz to 10BHz, source: 3c295.